Robert bosch

  • Germany-Kazakhstan, 7000 km
  • 10.76 x 4.52 x 4.79
  • the Boilers of 85 240 kg / 5 units

This completed project is impressive in its scope, quality and efficiency. It was a very complex project to transport the boilers of 85,000 kg / each. It was necessary to cover about 7,200 km. The journey started from the Bosch plant in Gunzenhausen (Germany), transportation to the port in Rota and then by sea through the canal the boilers were delivered to Rotterdam (Netherlands) and to St. Petersburg (Russia), then the boilers sent to the city of Shymkent (Kazakhstan). Because of the height (about five meters) in some places it was necessary to temporarily dismantle the power lines. Difficult weather conditions also created challenges as transportation was carried out during the winter months - the roads were partially covered with snow and ice. But thanks to an experienced team and well-coordinated work, the boilers safely reached final destination in 8 weeks. The bailers installed and the first two of boilers have already put into operation by Bosch service.

The next task was to install the boilers. Our company's specialists unloaded five BOSCH boilers of 86-tons from vehicles, turned to 90° and installed on the foundation in pre-prepared places. The work performed in a limited area with pits. The total weight of the installed equipment was 350 tons.

The company is grateful to the client for their trust and our specialists for their high-quality work.